Floor and building cement works

Ceramic sink

study time 1 minute

Floor and building cement works

After smooth And compaction of the surface should be done with a thickness of 10 cm compared to a thin layer of 200 kg of concrete (200 kg of cement per cubic meter), which in the term is called concrete. In order to improve the quality of the work done, concrete compaction can be done using a vibrator and then smoothing the cement surface using a special trowel