Reconstruction of the floor and ground of the building

Ceramic sink

study time 1 minute

Reconstruction of the floor and ground of the building

This The step immediately after installationfacilities"> color: rgb(61, 61); justify; white-space-collapse;"> main done. That is, after electricity and installation of water and gas pipes. In flooring, building flooralignment and prepares to continue execution. Indeed, this building floor is not only related to the first floor and includes the floor of every floor in the building and on a larger scale, even limited tonotand spaces such as sidewalks, streets or hospitals and other spaces also need flooring.